Since 2001 · CE & ISO 9001

Pallet Racking & Mezzanine Manufacturer for European Warehouses

  • Factory-direct, 30,000 m² plant
  • Free 3D & CAD layout design
  • Euro pallet-ready configurations
  • Shipped to all major EU ports
High-density pallet racking in a cold storage warehouse
High-Density Storage

Up to 2× More Pallets in Cold Chain & FMCG Sites

  • Radio shuttle & drive-in racking
  • FIFO or LIFO stock rotation
Mezzanine floor and cantilever racking for building supplies warehouse
Mezzanine Floors

Add a Floor, Not a Building

  • 300–1,000 kg/m² decking loads
  • Rack- or column-supported
  • CE CertifiedNo. 2435-CPR-8605159
  • ISO 9001:2015Certified quality management
  • Factory Since 200125 years of racking production
  • 120+ Countries10,000+ storage projects
Product Range

Warehouse Racking & Shelving Systems for European Logistics

From selective pallet racking for multi-SKU 3PL hubs to radio shuttle lanes for frozen food, every system is engineered to your pallet size, building height and forklift fleet.

Selective pallet racking for multi-SKU warehouse

Selective Pallet Racking

100% direct pallet access

The European warehouse standard for multi-SKU stock with frequent turnover — adjustable beam levels on 50 mm pitch.

  • Single/double deep
  • CE & ISO 9001
Explore system
Drive-in racking for high-density paper storage

Drive-In Racking

High density · LIFO

Removes aisles to store large volumes of the same SKU — ideal for cold stores and beverage depots where every m² is costly.

  • Lane storage
  • Heavy-duty steel
Explore system
Gravity flow pallet racking with roller lanes

Gravity Flow Racking

FIFO stock rotation

Pallets roll by gravity from loading to picking face — strict FIFO for food, beverage and pharmaceutical distribution.

  • Roller lanes
  • High throughput
Explore system
Radio shuttle racking system with pallet shuttle carrier

Radio Shuttle Racking

Semi-automated · FIFO/LIFO

A battery shuttle moves pallets inside the lanes, so forklifts never enter the rack — safer and faster in freezer warehouses.

  • Deep lanes
  • Fewer rack impacts
Explore system
Heavy duty cantilever racking for steel and timber

Cantilever Racking

Up to 3,000 kg per level

Open-front storage for timber, pipes, rebar and sheet — popular with builders' merchants across Europe, indoor or outdoor.

  • Single/double sided
  • Long loads
Explore system
Push back pallet rack with gravity carts

Push Back Racking

2–5 pallets deep · LIFO

Nested carts on inclined rails give multiple pallet positions per lane while keeping several SKUs at the aisle face.

  • Gravity carts
  • Dense & selective
Explore system
Structural steel mezzanine platform in warehouse

Structural Steel Mezzanine

300–1,000 kg/m²

Free-standing column-and-beam platforms for picking, packing or offices, with custom decking, stairs and safety gates.

  • Multi-tier
  • Custom loads
Explore system
Rack-supported mezzanine floor for e-commerce picking

Rack-Supported Mezzanine

Racking + platform in one

Pallet racking carries the floor above — combining bulk storage below with picking, sorting or assembly on upper levels.

  • E-commerce & 3PL
  • Custom capacity
Explore system
Engineer's Selection Guide

Which Racking System Fits Your Warehouse?

A quick comparison our project engineers use in first consultations with European buyers. The right choice depends on SKU count, pallets per SKU, stock rotation rules and truck type.

SystemStorage DensityPallet AccessStock RotationTypical European Application
Selective Pallet RackingStandardEvery pallet, directAny (FIFO / LIFO)3PL hubs, retail DCs, spare parts
Double Deep RackingMediumFirst pallet directLIFOWholesale with 2+ pallets per SKU
Drive-In RackingHighLane accessLIFO (FIFO with drive-through)Cold stores, beverages, seasonal stock
Push Back RackingMedium–HighLane, 2–5 deepLIFOFood production, building materials
Radio Shuttle RackingVery HighLane via shuttleFIFO or LIFOFrozen food, dairy, high-volume FMCG
Gravity Flow RackingHighLane, picking faceStrict FIFOPerishables, pharma, dated goods
VNA RackingMedium–HighEvery pallet, directAnyHigh-bay sites with turret trucks
Cantilever RackingLong loadsOpen frontAnyTimber, steel profiles, pipes

Density is relative to standard selective racking. Final configuration is confirmed after a free layout review of your floor plan and handling equipment.

About the Manufacturer

25 Years Engineering Warehouse Storage — Direct From the Factory

Guangzhou Heda Shelves Co., Ltd. was founded in 2001 and today designs and manufactures complete warehouse storage systems: pallet racking, industrial shelving, cantilever racking and mezzanine floors. Our 30,000 m² factory and 300+ technical staff produce up to 30,000 tonnes of racking per month.

For European distributors, installers and end users, that means one accountable source — from the first CAD layout and load calculation to production, seaworthy packing and documentation for your local inspection.

  • 25+ YearsRacking design & production experience
  • 30,000 t / monthIn-house production capacity
  • 10,000+ ProjectsCompleted warehouse storage cases
  • OEM & ODMPrivate label for EU distributors
HEDA Shelves racking factory in Guangzhou Watch: inside our racking production lines
  • 2001
    Year Established
  • 300+
    Technical & Production Staff
  • 30,000t
    Monthly Production Capacity
  • 30,000m²
    Factory Site Area
Why HEDA Shelves

What European Buyers Gain From Working With Us

Procurement teams choose us to cut racking cost without cutting engineering quality — backed by certified production and transparent documentation.

Racking engineers with 20+ years industry expertise
01

Proven Industry Expertise

Over two decades of racking projects across food, automotive, building supplies and cold chain — experience that anticipates problems before they reach your site.

Free 3D and CAD warehouse racking layout design
02

Free 3D & CAD Layouts

Floor plans, 3D renderings and load tables prepared before you commit — so your team, landlord or inspector can review the design upfront.

Powder-coated racking components quality inspection
03

Safe, Durable Steel

Cold-formed structural steel, automated punching, pickling & phosphating and electrostatic powder coating under ISO 9001:2015 quality control.

Fully customised warehouse storage solution
04

Fully Customised Systems

Frame heights, beam lengths, RAL colours and accessories specified to your building, pallets and trucks — not forced into a catalogue size.

Built for the European Market

Engineering, Documentation & Delivery Aligned With EU Projects

European warehouses run on Euro pallets, strict safety inspections and tight project timelines. Our export workflow is set up around those realities.

Euro Pallet Configurations

Bays planned around 1200 × 800 mm and 1200 × 1000 mm pallets, with correct beam clearances and pallet overhang.

EN-Referenced Calculations

Load tables and structural calculations referencing EN 15512 and EN 15620 principles available on request for local review.

CE & ISO 9001 Certified

CE certificate No. 2435-CPR-8605159, ISO 9001:2015 No. 18624Q00169R0M and RoHS compliance documents supplied with orders.

Sea Freight to EU Ports

Seaworthy packing with numbered components; FOB, CIF or DDP options to major European ports and inland destinations.

Installation Support

Assembly drawings, installation guides and remote engineer support; on-site supervision for larger European projects.

Inspection-Ready Safety

Load notices, column guards, end protectors and anti-collapse mesh available to support EN 15635 periodic inspections.

Regular destinationsRotterdamHamburgAntwerpFelixstoweGdańskLe HavreValenciaGenoaPiraeus
Industry Solutions

Specialised Storage, Designed for Your Sector

Each industry has a different bottleneck. Select your sector to see the challenge we solve and the systems we typically recommend.

Agricultural warehouse racking for grain, seed and fertiliser

Agriculture

Bulky farm goods, slow picking & dispatch

Storage for grain processors, seed suppliers, fertiliser distributors, feed manufacturers and agricultural co-operatives handling seasonal peaks.

  • Selective racking for bagged and palletised inputs
  • Drive-in lanes for seasonal bulk stock
Automotive parts warehouse shelving and racking

Automotive Parts

Cluttered bays, missing parts, slow repairs

From tyres and bumpers to small clips and fasteners, parts storage gets complex fast. We organise mixed SKUs so technicians find parts in seconds.

  • Longspan shelving & multi-tier mezzanines
  • Tyre racking and pallet racking for bulky parts
Building supplies warehouse with cantilever racking

Building Supplies

Bulky, fragile materials and wasted yard space

We work with builders' merchants to store timber, profiles, insulation and palletised materials safely — indoors and in outdoor yards.

  • Cantilever racking for long loads
  • Pallet racking, drive-in and mezzanine floors
Food and beverage distribution warehouse racking

Food & Beverage

Damaged stacked goods, hard FIFO control

Complete storage for food manufacturers, beverage producers, wholesalers and food distribution centres where shelf life and traceability matter.

  • Gravity flow racking for strict FIFO
  • Carton flow racking for case picking
Cold storage warehouse with high-density racking

Cold Storage

Expensive refrigerated space, clogged aisles

Every cubic metre of a chilled or frozen store costs energy. High-density layouts reduce aisle volume and the refrigeration load per pallet.

  • Radio shuttle racking for frozen pallets
  • Drive-in racking for single-SKU volumes
Chemical drum storage racking in industrial warehouse

Chemical Storage

Unstable drums and mixed-storage risks

Racking and mezzanine solutions for chemical manufacturers, lubricant distributors and paint warehouses that need segregation and stable drum support.

  • Heavy-duty pallet racking with drum supports
  • Wire mesh containers for segregated stock
Project References

Recent Warehouse Storage Projects

Real installations designed and manufactured by our team — the same engineering process applied to every European project.

All Case Studies
Heavy-duty racking system for chemical storage
ChemicalSep 2026

Heavy-Duty Racking System for Chemical Storage

Drum-rated pallet racking with segregated bays for an industrial chemical distributor.

Rack-supported mezzanine floor for manual picking warehouse
PickingSep 2026

Rack-Supported Mezzanine for a Manual Picking Warehouse

Pallet storage below, multi-SKU picking above — floor area effectively doubled.

Multi-level mezzanine with reinforced racking for auto parts
AutomotiveSep 2026

Multi-Level Mezzanine for an Auto Parts Warehouse

Reinforced racking structure supporting several picking levels for fast-moving spare parts.

How We Work

From Floor Plan to Delivery in Four Clear Stages

One project engineer stays with you from the first drawing to the final container.

Project consultation

1. Consultation

Review of your floor plan, pallets, loads and handling equipment.

Racking layout design

2. Design

CAD layout, 3D rendering and load calculations for approval.

Racking manufacturing

3. Manufacturing

In-house production with inspection at every stage.

Shipping to Europe

4. Shipping

Seaworthy packing, documents and delivery to your EU site.

Our 10-Step Production Process

Raw steel material inspection
STEP 01

Raw Material Inspection

Precision steel cutting
STEP 02

Precision Steel Cutting

Automated upright column punching
STEP 03

Automated Column Punching

Cold bending forming of racking profiles
STEP 04

Cold Bending Forming

Roll profile forming
STEP 05

Profile Roll Forming

Polishing of steel components
STEP 06

Polishing

Beam connector welding
STEP 07

Welding

Pickling and phosphating pre-treatment
STEP 08

Pickling & Phosphating

Electrostatic powder coating line
STEP 09

Electrostatic Powder Coating

Quality control and shipping
STEP 10

QC & Export Packing

Quality & Compliance

Certified Manufacturing You Can Verify

Certificate numbers are published so your procurement or QHSE team can verify them independently before placing an order.

  • CE CertificationNo. 2435-CPR-8605159
  • ISO 9001:2015 Quality ManagementNo. 18624Q00169R0M · valid until 2027-06
  • RoHS ComplianceRestriction of hazardous substances in coatings & components
View All Certificates
CE mark ISO certification mark RoHS mark
HEDA Shelves CE certificate
HEDA Shelves ISO 9001 certificate
HEDA Shelves test report
HEDA Shelves product certificate

Trusted by brands & distributors worldwide

Partner logo 1 Partner logo 2 Partner logo 3 Partner logo 4 Partner logo 5
Insights

Warehouse Racking Guides From Our Engineers

Practical knowledge for planning, budgeting and specifying your next storage project.

Read All Articles
Dynamic storage racking systems comparison

Dynamic Storage Racking: Drive-In, Push Back, Pallet Flow & Radio Shuttle

How the four dynamic systems differ in density, rotation and cost.

Warehouse mezzanine layout design

Warehouse Mezzanine Layout Design for Warehouse Racking

Planning column grids, stairs and load zones on a mezzanine.

Warehouse racking system design and layout

Warehouse Racking System Design & Layout

Aisle widths, bay sizing and clearances explained step by step.

Warehouse racking price guide

Warehouse Racking Price Guide: What Determines Project Cost

Steel weight, height, accessories and freight — the real cost drivers.

Buyer FAQ

Questions European Buyers Ask Before Ordering

Straight answers on standards, lead times and logistics. Need more detail on a specific project? Our engineers respond in English.

More FAQs
Can your racking be configured for Euro pallets (1200 × 800 mm)?
Yes. Beam lengths, frame depths and pallet supports are specified around EUR/EPAL 1200 × 800 mm and 1200 × 1000 mm pallets, with clearances calculated per bay during the free CAD layout stage.
Which certifications and engineering documents do you provide?
We hold CE certificate No. 2435-CPR-8605159 and ISO 9001:2015 certificate No. 18624Q00169R0M. Load tables, layout drawings and structural calculations referencing EN 15512 and EN 15620 principles can be supplied on request for review by your local engineer or inspector.
How long does delivery to Europe take?
Production typically takes 15–30 days depending on project volume. Sea freight from Guangzhou to major European ports such as Rotterdam, Hamburg, Antwerp or Valencia usually takes around 30–40 days.
What information do you need for a layout proposal?
A floor plan (DWG or PDF), clear building height, pallet size and maximum weight, forklift or truck type, number of SKUs and the delivery country are enough for a first layout.
Do you support installation in Europe?
Every order ships with numbered components, installation drawings and assembly guides. Remote technical guidance is available, and on-site supervision can be arranged for larger projects.
Can you supply OEM or private-label racking for distributors?
Yes. OEM and ODM manufacturing is available, including custom RAL powder-coat colours, profiles, labelling and packaging for distributors and installers.
HEDA Shelves engineer preparing a warehouse racking layout
Free layout. Clear calculations.Engineer-reviewed proposals for European warehouses.
Start Your Project

Send Your Brief, Get an Engineered Layout

Share these details with our project team and receive a CAD layout and system recommendation tailored to your site.

  • Floor plan (DWG / PDF)
  • Clear building height
  • Pallet size & max weight
  • Forklift / truck type
  • SKU count & throughput
  • Delivery country
Contact Our Engineers