Warehouse Storage Solution Experts for Global Logistics
Guangzhou Heda Shelves Co., Ltd. delivers comprehensive, factory-direct engineering and OEM/ODM manufacturing services tailored to industrial warehouses, commercial distribution hubs, and third-party logistics (3PL) providers across Europe and worldwide.
With over two decades of structural design competence, our in-house engineering team converts complex architectural floor plans into high-density storage facilities. By optimizing vertical clearance, material flow lanes, and forklift operational corridors, we help enterprise clients reduce operational expenses while maximizing cubic storage density.
Custom Pallet Racking & Multi-Tier Mezzanines
Our extensive portfolio spans selective pallet racking, radio shuttle automation, high-bay cantilever structures, and column-supported mezzanine floors built precisely to Euro pallet (EUR/EPAL 1200 × 800 mm) parameters and regional EN engineering standards.
Supported by a 30,000 m² automated production base, modern CNC roll-forming lines, and robotic welding stations, Guangzhou Heda Shelves Co., Ltd. executes high-volume contracts with certified accuracy, guaranteed steel tensile properties, and dependable delivery schedules.
How We Cooperate: 5-Stage Project Execution
A structured engineering and project management methodology that guarantees transparent design verification, precise manufacturing, and seamless site delivery.
Send Your Design
Share your architectural building dimensions, floor load capacity, inventory characteristics (SKU profile, pallet dimensions, gross weights), and handling truck parameters.
Technical Review
Our structural engineers evaluate column placements, emergency egress paths, fire sprinkler clearances, and offer free AutoCAD architectural draft layouts.
3D Validation
Upon initial layout confirmation, our team produces detailed 3D spatial renderings and load capacity charts to ensure complete stakeholder alignment before production.
Precision Fabrication
Contract manufacturing utilizes certified high-strength steel, continuous cold-roll forming, automated punch tooling, and multi-stage electrostatic powder coating.
Export Packing & Dispatch
Seaworthy bundle packaging wrapped in heavy bubble film, organized per assembly sequence, and securely loaded into 40ft HQ containers for direct EU port transit.
Complimentary Warehouse Design & Architectural Planning
Guangzhou Heda Shelves Co., Ltd. eliminates project guesswork by providing fully engineered design packages before manufacturing commences.
Fast 2D AutoCAD Layouts
Send us your building perimeter dimensions and column grid locations. Within 72 hours, our design office delivers optimized 2D layout drawings mapping aisle widths, pallet orientations, safety zones, and forklift turning radiuses.
Full 3D Spatial Rendering
Visualize structural elevations, vertical clearance margins, pick-tower catwalks, and multi-tier mezzanine decking before placing your order. Clear 3D models allow operational teams to simulate picking efficiency.
Holistic Intralogistics Master Plan
From static selective pallet racking to radio shuttle systems, carton flow lanes, and structural mezzanine integration, we engineer unified material storage ecosystems matching your annual throughput goals.
Racking Protection & Industrial Storage Accessories
Ensure complete European workplace safety compliance (EN 15635) with factory-engineered protective accessories and secondary storage units.
Upright Column Protectors & Safety Mesh
Heavy-duty steel corner guards, upright impact protectors, and anti-collapse rear wire mesh to safeguard personnel along traffic corridors.
Heavy-Duty Rackable Steel Pallets
Engineered for heavy loads and automated racking lanes, offering superior fire resistance, hygiene, and lifespan compared to wood.
Mobile Industrial Ladder Carts
Ergonomic order picking ladder trolleys equipped with spring-loaded brakes for safe manual shelf picking across multi-level facilities.
Collapsible Wire Mesh Containers
Stackable, drop-gate wire containers for automotive components, castings, and bulk goods, fully compatible with standard pallet runners.
International Installation Guidance & Site Supervision
Reliable overseas deployment through comprehensive digital instruction packages and certified structural supervision.
Detailed Assembly Blueprints
Every shipment is accompanied by sequential assembly plans. Uprights, cross beams, diagonal bracing, and anchor points carry corresponding component tags matching drawing sheets.
High-Definition Video Tutorials
We provide 3D step-by-step video tutorials and real-time remote engineering assistance to clarify beam safety pin engagement, floor anchor torque, and frame plumb leveling.
On-Site Project Supervision
For high-bay installations, complex cantilever runs, or multi-level picking platforms, experienced HEDA installation supervisors can deploy on-site to oversee local assembly teams.
Frequently Asked Questions on Services & Ordering
Key commercial, technical, and logistical specifications for procurement managers and project contractors.
What is the Minimum Order Quantity (MOQ) for custom OEM/ODM racking services?
What installation support services do you offer for overseas projects?
What grade of raw steel is used, and how do you ensure high load-bearing safety?
What is your standard export lead time for complete racking systems?
Can you provide customized brand branding (OEM/ODM) for European distributors?
Where is your factory located, and can clients schedule an on-site audit?
What is your export packaging standard to prevent transit damage?
How can we start a free layout proposal for our facility?
Plan Your Warehouse Racking Project With Our Technical Team
Contact Guangzhou Heda Shelves Co., Ltd. today to receive free 2D/3D CAD layouts, structural load calculations, and factory-direct quotations tailored to European logistics standards.