Precision-manufactured cold-rolled steel storage units built for heavy palletized loads, industrial parts distribution, and high-density warehouse operations across Ireland.
An authoritative operational guide for logistics directors, procurement heads, and plant engineers managing storage infrastructure across the Republic of Ireland and Northern Ireland.
The industrial real estate landscape in Ireland has experienced a sustained structural contraction in prime logistics vacancy rates, especially throughout the Greater Dublin Area (GDA), Naas Enterprise Park, Little Island (Cork), and Shannon Free Zone. With prime industrial rents in South Dublin and along the M50 corridor exceeding €13.50 to €15.50 per square foot, supply chain managers cannot afford horizontal footprint sprawl. Operational profitability hinges directly on volumetric cubic optimization—transforming every vertical millimetre of clear warehouse height into compliant, secure storage capacity.
HEDA Shelves manufactures cold-formed structural steel racking systems that allow Irish distribution centers, pharmaceutical plants, and high-tech manufacturing facilities to achieve vertical density safely. Whether implementing multi-tier mezzanine floors that double active footprint without building structural alterations or installing high-bay narrow aisle (VNA) selective racking, our systems are calculated against the exact dynamic loads, beam deflection limits, and floor slab load-bearing capacities typical of modern Irish warehousing stock.
Under the Irish Safety, Health and Welfare at Work Act 2005 and the Safety, Health and Welfare at Work (General Application) Regulations 2007 (S.I. No. 299 of 2007), employers and warehouse operators carry a strict statutory duty of care to ensure all static storage equipment is structurally verified, safely installed, and inspected annually by a certified Person of Technical Competence.
Importing uncertified or non-conforming industrial shelving poses immense liability during Health and Safety Authority (HSA) workplace audits or in the event of load-beam failure. Every industrial storage system produced by Guangzhou Heda Shelves Co., Ltd. is engineered in accordance with European standard EN 15512 (Steel static storage systems – Adjustable pallet racking systems – Principles for structural design) and toleranced to EN 15620. Furthermore, our production operates under CE Certificate No. 2435-CPR-8605159 and ISO 9001:2015 certification. We supply certified static calculation packages, allowable uniformly distributed load (UDL) notices, and clear beam-locking pin documentation necessary to satisfy Irish insurers and local structural engineers.
Ireland’s hyper-maritime climate—characterized by persistent relative humidity exceeding 80%, severe condensation cycling in unheated transit warehouses, and airborne marine chlorides along coastal logistics hubs in Dublin Port, Cork Harbour, and Foynes—accelerates rust formation on sub-standard steel. Untreated steel surfaces quickly develop intergranular pitting, compromising structural integrity within 24 to 36 months.
HEDA Shelves eliminates this operational risk through an automated 10-stage pre-treatment and electrostatic finishing cycle. Raw steel components undergo multi-stage alkaline degreasing, acid pickling, and hot zinc-iron phosphating before receiving a 70–90µm thermosetting epoxy-polyester powder coating cured at 190°C. For unconditioned agricultural stores, fertilizer depots, or wet processing facilities in Galway and Waterford, we provide hot-dip galvanized uprights and beams delivering C3/C4 atmospheric corrosion protection tested to withstand over 500 hours of continuous neutral salt spray (ISO 9227) without coating delamination.
| Storage System Type | Load Capacity (UDL per Tier) | Bay Widths (mm) | Standard Depths (mm) | Finishing & Protection | Primary Industrial Sector in Ireland |
|---|---|---|---|---|---|
| Heavy Duty Warehouse Pallet Rack | 1,000 – 4,000 kg | 1,800 / 2,700 / 3,300 | 800 / 1,000 / 1,100 | Epoxy-Polyester / Galvanized | M50 Logistics Hubs, FMCG, 3PL Distribution |
| Industrial Longspan Shelving | 300 – 1,000 kg | 1,200 / 1,500 / 2,000 | 500 / 600 / 800 / 1,000 | Powder Coated / Zinc Shelf | Automotive Aftermarket, Hardware, Retail DCs |
| Boltless Rivet Medium Shelving | 150 – 350 kg | 900 / 1,200 / 1,500 | 300 / 450 / 600 | Micro-Textured Epoxy Coating | E-commerce Picking, Engineering Stores, Archive |
| Structural Cantilever Racking | 500 – 3,000 kg/Arm | Custom Column Spacing | 600 / 800 / 1,000 / 1,200 | Hot-Dip Galvanized / Heavy Epoxy | Builders' Merchants, Timber, Extruded Plastics |
| Multi-Tier Mezzanine Storage | 300 – 1,000 kg/m² | Engineered Column Grid | Multi-Level Modular | Non-slip Steel Decking / B-Deck | Pharma Cleanrooms, High-density Pick Modules |
From cleanroom-adjacent secondary packaging in Ringaskiddy to rapid pick-and-pack fulfillment centres along the Naas dual carriageway, our systems are tailored to sector-specific operational workflows.
Tailored for biopharmaceutical clusters in Ringaskiddy, Little Island, and Grangecastle. Featuring non-outgassing powder coats, stainless or galvanised mesh decks, and cleanable tubular profiles for API storage and quarantine rooms.
Configured for high-throughput distribution hubs in Baldonnell, Park West, Citywest, and Newbridge. Integrates heavy longspan shelves with carton flow lanes and high-bay pallet racking supporting Euro and perimeter UK pallets.
Engineered for medical device manufacturing clusters in Parkmore and Shannon Free Zone. Boltless adjustable shelving systems with ESD conductive protection, clear plastic bin separators, and precision parts containment.
Heavy duty shelving and push-back racking tailored for dairy, meat, and beverage processors across Munster and the Border Region. Resistant to extreme cold cycling down to -30°C without steel embrittlement or surface blistering.
Founded in 2001, Guangzhou Heda Shelves Co., Ltd. operates state-of-the-art automated cold roll-forming lines, robotic welding stations, and continuous powder-coating plants delivering over 30,000 metric tonnes monthly.
STEP 01
Steel Inspection
STEP 02
Precision Slitting
STEP 03
CNC Punching
STEP 04
Cold Roll Forming
STEP 05
Beam Profiling
STEP 06
Edge Deburring
STEP 07
Robotic Welding
STEP 08
Zinc Phosphating
STEP 09
Powder Coating
STEP 10
QC & Seaworthy Pack
Certificate No. 2435-CPR-8605159 confirming strict compliance with European structural steel construction directives.
Certificate No. 18624Q00169R0M verifying end-to-end quality control from mill certificate tracking to final load testing.
Non-toxic, heavy metal-free powder coating formulations compliant with EU environmental safety standards for indoor operations.
Over 10,000 warehouse projects completed across 120+ countries since 2001, providing complete peace of mind for Irish importers.
Everything procurement officers, warehouse directors, and supply chain managers in Ireland need to know regarding shipping routes, import duties, HSA standards, and installation.
We ship FCL (Full Container Load) containers directly to Dublin Port or the Port of Cork (Ringaskiddy deepwater terminal). We offer FOB, CIF, or full DDP (Delivered Duty Paid) terms through our trusted European forwarding partners, handling container haulage directly to your warehouse loading bay anywhere in Ireland.
Yes. Our static calculation criteria align directly with EN 15512 and EN 15620 guidelines referenced by the Health and Safety Authority (HSA) in Ireland. Every delivered order includes stamped maximum load rating capacity plaques (UDL signs) to be mounted on end frames in full compliance with EN 15635.
We configure beam clear openings specifically for your mix of Euro pallets (1200 x 800 mm) and standard Irish/UK pallets (1200 x 1000 mm). For dual-standard facilities, we provide heavy-gauge steel pallet support bars or reinforced wire mesh decks, eliminating the risk of pallet drop-through when handling mixed fleets.
Custom production typically takes 15 to 25 working days depending on order tonnage. Ocean freight from Guangzhou/Nansha port directly to Dublin or Cork takes approximately 32 to 38 days. We advise our Irish clients to initiate CAD layout approvals roughly 8 to 10 weeks prior to facility handover.
Industrial steel racking is classified under HS / TARIC code 7308.90. VAT-registered companies in Ireland can utilize Postponed Accounting for VAT on imports under Revenue Ireland regulations, eliminating the cash flow burden of paying 23% import VAT upfront at the port of entry.
Every system is dispatched with piece-marked structural drawings, connection detail blueprints, and bolt torque specifications. If you do not have in-house maintenance crews, we provide detailed technical oversight or can coordinate with independent Irish racking installation subcontractors.
Send our senior engineering team your warehouse architectural floor plan (DWG/PDF), clear headroom dimensions, and load specifications. We will generate an optimized 2D/3D CAD layout proposal within 24 hours.
Connect with our technical design division now to discuss your facility requirements.
Get a Quote