Factory Price Customized Medium-Duty Rack Warehouse Steel Metal Rack Shelf

Product Description

Medium Duty Metal Rack Banner
Medium Duty Metal Rack Structure
Specification
A full varity of ranges and accessories available
1. Item: Medium-Duty Metal Rack Shelf
2. Style: Quick access, Adjustable
3. Material: Grade Q235 (or SS400) Q345
4. Certification: CE/ISO9001
5. Standard Color: Blue(RAL5017), Orange(RAL2004), Green(RAL6000), Light Grey (RAL7035), Yellow(RAL1037)
6. Adjustable Pitch: 50mm, 50.80mm, 75mm, 76.20mm
7. Access Style: High accessibility & selectivity
8. Finishing: Powder Coated or Galvanized
9. Application Environment: Normal Temperature or Freezer
10. Design Service: CAD service available
11. Back-up Service: Installation Drawing/On Site Instruction
12. MOQ: 1 unit
13. Lead time: 3 weeks for 2*40' container
14. Standard package: Palletized,Export-Purpose Packaging
15. Container Load: 10-15tons/1*20' container, 20-25tons/1*40' container
16. Trade Term: EXW/FOB/CNF/CIF
Technical Specifications
Company Profile
Customer Photos
Customer Showcase
Our Advantages
Manufacturing Advantages
Packing & Delivery
Frequently Asked Questions
Q What is the minimum order quantity (MOQ) for medium-duty metal rack shelves?
Our Minimum Order Quantity (MOQ) is just 1 unit, catering to both small trial orders and large-scale industrial warehouse configurations.
Q What steel grade materials and surface treatments are used?
We manufacture our racks using premium structural Grade Q235 (or SS400) and Q345 steel. Surface finishing options include electrostatic powder coating or galvanization for superior corrosion resistance.
Q Can these racks be deployed in cold storage or freezer environments?
Yes, our racking systems are designed and treated to withstand diverse conditions, performing effectively in both standard room temperatures and sub-zero freezer environments.
Q Do you provide customized CAD layouts and installation support?
Yes, we provide professional CAD design services tailored to your space requirements, alongside comprehensive installation drawings and optional on-site instruction.
Q What is the standard production lead time and loading capacity?
Standard lead time is roughly 3 weeks for a 2*40' container order. Container capacities range from 10-15 tons per 20' container to 20-25 tons per 40' container.

Related Products