OEM / ODM
Structural dynamics, gravity flow engineering, and automated intralogistics systems for global multi-tier distribution centres.
Explore factory-direct industrial racking systems engineered for high SKU velocity, certified safety resilience, and direct integration with gravity flow tracks.
OEM / ODM
Custom Built
CE Certified
Heavy Profile
High Bay
Sanitary Grade
Modular
EN 15512 Spec
An analysis of gravity incline mechanics, roller bed tribology, dynamic braking systems, and lean OEM/ODM design standards.
Proper pallet flow racking relies on a strict incline ratio between 2.5% and 3.5% for standard wood and plastic pallets, and up to 4.0% for carton live storage. Roller spacing and diameter are customized via finite element analysis (FEA) to eliminate point loading and sagging under loads from 300 kg to 1,500 kg per pallet position.
High inertia in deep storage lanes creates safety risks. Our systems integrate heavy-duty centrifugal brake rollers every pallet length to keep rolling speed under 0.3 m/s. Patented mechanical end separators relieve dynamic line pressure on front pick faces, enabling safe extraction without jams.
Every facility demands specific dimensions. As a direct manufacturer, Heda Shelves delivers full custom design: custom upright heights up to 12 meters, pitch-adjustable beams on 50mm increments, specialized cold-galvanized roller bearings for sub-zero cold chain logistics, and tailored split-roller modules.
| Storage Mechanism | Typical Dynamic Load | Inventory Logic | Space Utilization | Best Fit Application |
|---|---|---|---|---|
| Pallet Gravity Roller Racks | 500 - 1,500 kg / pallet | Strict FIFO | Up to 85% volumetric density | Perishable food, cold storage, pharmaceutical dispatch |
| Carton Flow Roller Shelves | 25 - 100 kg / track meter | Strict FIFO | Continuous split-case picking | E-commerce fulfillment, automotive small-parts kitting |
| Push-Back Roller / Cart Systems | 500 - 1,200 kg / pallet | LIFO | Medium-high density (2-6 deep) | Bulk buffering, seasonal surge staging, non-expiry SKUs |
| Automated Shuttle & Roller Interfacing | Up to 2,000 kg / unit | Hybrid FIFO / LIFO | Maximum deep-lane density | High-throughput FMCG central distribution hubs |
Industry research shows modern warehouse procurement shifting toward automated hybrid platforms, carbon-reduced steel, and intelligent condition monitoring.
Global fulfillment centers are merging autonomous mobile robots (AMRs) with live roller racks. Procurement specifications increasingly require standardized intake geometries, sensor-reflective track stops, and automated pick-to-light (PTL) brackets mounted directly to roller beds for lights-out sorting.
European and American engineering standards (EN 15512, EN 15620, RMI MH16.1) mandate higher yield-strength ratings and verifiable impact ratings. Buyers are moving away from unbranded steel toward certified Q235B and Q355B hot-rolled strip steel, coupled with lead-free, electrostatic epoxy powder coating lines.
As industrial electricity costs rise, warehouses are turning to gravity-powered flow racks to replace powered conveyor segments where possible. By eliminating motor drives from buffer accumulation zones, facilities achieve zero-energy transport while cutting recurring maintenance costs.
With over 25 years of engineering experience, our ISO 9001 and CE-certified operations deliver predictable quality and custom manufacturing direct from the factory floor.
Founded in 2001, our facility has delivered more than 10,000 successful warehouse projects across Europe, the Americas, Southeast Asia, and the Middle East.
Custom upright profiles, unique beam step connections, tailored RAL powder finishes, and private labeling configured for system integrators and distributors.
Our in-house structural engineers evaluate clear ceiling heights, slab load capacities, and forklift turn radii to produce detailed CAD layouts within 24–48 hours.
Operating high-speed continuous roll-forming lines, automated laser-guided punching, multi-stage chemical pre-treatment, and electrostatic powder coating.
Clear engineering answers covering load calculations, roller wear life, incline settings, and international logistics.
Submit your warehouse floor layout, beam load requirements, and handling equipment specifications. Our senior structural engineers will prepare an optimized 2D/3D CAD layout, bill of materials, and factory-direct quotation within 24 hours.